Logged in as:

Maintenance break starting Friday, 7 November, at 11.00 CET. It's estimated to end by Monday, 10 November, 09:00 CET.

HF1503-16G

HF1503-16G

FASCIO CAVI 16M T-SYSTEM HF 9/24

Treccia rame ultraflessibile a doppia trefolatura, copertura in pelle fiore e soft Sunprene, tubi in silicone extraflessibile

Raffreddamento Aria
16 m